01. | 1990 | Baekdoo engineering established |
08. | 1991 | Developed dense-phase, high-speed air conveyance system |
06. | 1992 | Converted to Baekdoo Industries Co., Ltd. |
02. | 1993 | Developed rotary feeder |
03. | 1996 | Developed small capacity weighing system |
10. | 1996 | Developed dense-phase, low-speed pneumatic conveying system |
06. | 1999 | Applied for a patent for small capacity weighing system (No. 022155) |
03. | 2004 | Completed Paltan Factory, Hwaseong City, Korea |
09. | 2007 | Received contract for 4×240MW Nueva, Campich, Angamos project in Chile |
02. | 2008 | KS Q / ISO 9001 : 2008 |
05. | 2009 | Applied for a patent, round valve for apparatus for power conveyance (No. 0900905) |
08. | 2009 | Applied for a patent, LOW PRESSURE SYSTEM for apparatus for power conveyance (No. 0915877) |
07. | 2010 | Changed company name to BDH Co., Ltd. (Baekdoo High Technology) |
03. | 2011 | Joined The Korea Trade Association |
11. | 2011 | Approved as a research institute |
03. | 2013 | Certified a technology-oriented Innovative small & medium company (INNO-BIZ) |
세계 최고의 플랜트 기업이 되기 위해 도전을 멈추지 않는 기업 BDI
발전 플랜트 분야에 세계 최고 기업이 되기 위한 BDI에 도전과 노력은 오늘도 내일도 계속될 것입니다
POWER PLANT
EPC(Engineering, procurement and construction) 복합화력발전소 공사를 수주하는 등 발전 분야에서 세계 최고 수준의 경쟁력을 인정받고 있습니다